TRIUMF SITE PICTURES City of VANCOUVER in background | UBC in background | 2004
| 2013 - ARIEL Under Construcion
TRIUMF Staff , 1972
Staff pictured on the lower half of the Main Magnet poles (taken during construction).
Vacuum tank, upper magnet poles and the support/lifting structure are not yet assembled.
Eight of the twelve dual Lifting Jack assemblies can be seen around the outer edge.
Joining sections of the lower Main Magnet coil can be seen clearly at 3 o'clock and 7 o'clock.
The holes through the magnet sectors are for the tie rods which are fastened to the floor and the
underside of the vacuum tank to prevent it from being crushed by atmospheric
pressure when evacuated.
TRIUMF 500 MeV Cyclotron, with the lid raised, from the southeast corner of the Vault
Mediun resolution (400K) | HIGH Resolution (1.5M)
Inside the TRIUMF 500 MeV Cyclotron, with the lid raised.
22 Apr 1991 - model: Peter Grant
Mediun resolution (224K) | Med.Res. with CAPTIONS (700K) | HIGH Resolution (1.5M)
| with the Service Bridge IN (566K) | Corrected for fisheye distortion (1.5M)